Laila Jawad Houston TX, Cell (832) 2910826 Laila_nazim@hotmail.com OBJECTIVE The work experience covers 10 years of professional experience in
the field of Project management, Planning, & Scheduling, Cost Controls
and Cost Estimation which outlines my expertise in EPC (Engineering,
Procurement and Construction) projects for Oil and Gas industry SUMMARY ·
Having
more than 10 years of Planning & Scheduling/ Cost Controls
and Cost Estimation experience for several Energy, Oil/Gas &
Petrochemical Pipelines, Refinery Projects (Upstream & Down
Stream), Infrastructure Projects, underground utility experience, Heavy Industrial
Buildings, Road, Bridges Pumping Station, Underground storage tanks. ·
Flexible,
assertive, team player and able to complete the task within time &
budget. ·
Project
Cost Management, Planning / Scheduling and monitoring by PRIMAVERA P3, P5,
and P6 & P6.82. ·
Successfully
completed
several EPC Energy projects, involved multidisciplinary
engineering. EDUCATION ·
Master
of Public Administration (M.P.A) in Finance (with Management courses), 2003. ·
Bachelor
of Public Administration (B.P.A) 2002. EXPERIENCE Lockerbie & Hole Edmonton
Alberta Canada Scheduling and project controls Planner/Scheduler
July 2010 -2014 MVU-FC Post Outage (Suncor Major Project) - Planner / Scheduler Environment Suncor Company is an integrated energy company
strategically focused on developing Athabasca-Canada oil sands. Athabasca one
of the world's largest petroleum resource basins. Mostly Suncor projects are
located in Fort McMurray. Fort McMurray, Alberta, is located about 435
kilometers northeast of Edmonton, nestled in the boreal forest at the
confluence of the Athabasca and Clearwater rivers. This Project is located in the base plant of Suncor .MVUFC was created to
increase the overall plant capacity from 275,000 to 350,000 BPD and estimated
cost was $282M. This project was included modifications to the vacuum unit
and debottleneck of the cocker unit i.e. Mechanical, Steel Structure,
Piping, Electrical & Instrumentation and EHT.(This project comprised of
Plant 52, Plant 56, Plant 57 and installation of various pumps, several
exchangers, Civil Works, Deluge Piping, Heavy Naphtha Piping, Heavy Naphtha
electrical/instrumentation, Slop oil Piping, Anti-vibration Stakes, HAGO
& HVGO System, Underground Piping, Road Works and Fire proofing). ·
Develop
schedule in central P3e/c (P-5) database based on the budgeted hours,
drawings and project scope of work and linked logically with the work
sequence & with the minimum possible target and imposed or constraint
dates ·
Resource
loaded with labor resources - per trade/ material resources/loaded with
equipment resources and attach to the proper calendar ·
Resource
levelling and analyses to be sure that whatever resource required completing
the job is available and leveled to avoid any unexpected spike over the
project life cycle. Once the schedule is completed, reviewed and approved by
the project team and the client, assign baseline of the project ·
Update
Schedule on weekly basic. Keep track of the budget man-hours & budget
material quantities for comparison at different project stages. ·
Review
critical path on weekly basic and compare critical activities to the Project
base line to be sure that the required correction action is been taken to
bring the schedule back on schedule or to deal with any delay may impact the
project completion ·
To
review the schedule hold schedule review meetings with all discipline leads
and superintendent to review the schedule ·
Develop
recovery schedules /mitigations plans in case of potential delays ·
Attend
client’s weekly schedule review meeting & contract review meeting with
Project Control Team ·
Coordinate
with Engineering, Procurement and Construction to make the schedule live and
realistic ·
Develop
& Maintain Project Control Report such as S Curve, Commodity Curve, Multi
Discipline Productivity Curve & Schedule Log ·
Assist
Superintendents in developing the three-week look ahead ·
Provide
client with required manpower Histogram and progress and productivity report ·
Monitor
& supporting project through ICMS ·
Providing
TCCC status & Non Productive Man hours to the client ·
Preparation/providing
client EWO logs, Direct Hours. Indirect Hours, Cost incurred approved PO
revision amount ·
Sync
rude-Exxon Mobil - UE-1 Froth Treatment Plant .Underground Utility work and
Living Camps. ·
Preparation
of project schedules for multi disciplines. Responsible for all planning
aspects of the project, coordinating equipment deliverables, ensuring materials
availability, daily progress monitoring, weekly updating of the project
schedule, highlighting delays and advising on recovery actions needed.
Participated in weekly co-ordination meetings with Client and Project Manager
in reviewing current status and budget allocation. ·
In
charge of planning & cost control department, preparation of progress
monitoring tools, collection of man-hours and progress reporting undertaken
by the Plants ·
Created
and converted databases from Access 2000 to Access XP. Programmed and
converted spreadsheets using MS Excel. Syncrude-Exxon
Mobil - UE-1 Froth Treatment Plant .Underground Utility work and Living
Camps. · of
project schedules for multi disciplines. Responsible for all planning aspects
of the project, coordinating equipment deliverables, ensuring materials
availability, daily progress monitoring, weekly updating of the project
schedule, highlighting delays and advising on recovery actions needed.
Participated in weekly co-ordination meetings with Client and Project Manager
in reviewing current status and budget allocation. ·
In charge of planning & cost
control department, preparation of progress monitoring tools, collection of
man-hours and progress reporting undertaken by the Plants ·
Created and converted databases
from Access 2000 to Access XP. Programmed and converted spreadsheets using MS
Excel. Project:
Petro Ecuador Esmeraldas Refinery Revamp Project-Lockerbie Client:
PETRO ECUADOR ·
Develop, monitor and update
Schedule for detail engineering work of Merox- Amine Units and Sour Water
Stripping using Primavera software. ·
Project Set-up (working with
project management, system administration and document controls to develop a
project set-up that facilitates both internal and external Project Services
requirements). ·
Planning/Scheduling (Provide
Project Planning/Scheduling services using to project teams to ensure that
completion dates are being met). ·
Project Updates (weekly
progress-collection & updates; schedule updates & management; change
order/variation management; weekly upload of project data to Project Controls
Database) Project:
BP Appomattox SP89E Pipeline Project
Project:
Hebron Newfoundland (Offshore)
2004-2009 U & Z-Planning Engineer- Pak Arab Refinery Project
(PARCO)- underground utility experience, Road and Bridges. Shell
Pakistan- Gas Stations, Pump Stations GTR Pakistan-Building AGP
(Pvt) Ltd- Building PAK ARAB REFINERY LTD (PARCO) is a fully
integrated energy company and is one of the largest companies in the
Pakistan’s corporate sector with an asset base exceeding US $ 1.52
billion. PARCO, a Joint Venture between Government of Pakistan and the
Emirate of Abu Dhabi was incorporated as a public limited company in
1974. ·
Responsible
for all planning aspects of the project, coordinating engineering and
equipment deliverables, daily progress monitoring, weekly updating of the
project schedule, highlighting delays and advising on recovery actions needed
·
In
charge of planning & cost control department, preparation of progress
monitoring tools, collection of man-hours and progress reporting undertaken
by the Project. ·
Established
Project delivery requirements to maintain overall Project Milestones ·
Prepare
Weekly Progress Reports. Generating Progress & Productivity Reports ·
Prepare
budgets, reforecast variations and changes and brought to attention of
Project Manager any variance from the approved plan and recommended remedial
actions. ·
Prepared
weekly discipline look ahead schedules. AREA OF EXPERTISE
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|